Pool Cost Calculator

Pick your pool type and enter the size and a price per square foot to estimate the build cost.

How to use this calculator ↓

What your result means

Total is the surface area times your price per square foot. The type dropdown labels the estimate; enter that type's price. Rough per-sq-ft surface ranges: vinyl $50 to $100, fiberglass $80 to $150, concrete $100 to $200. Then add 30 to 50% for decking, equipment, and landscaping, plus a $300 to $1,500 permit.

How to use this calculator

  1. Plan pool size in ft.
  2. Pick construction type.
  3. Enter cost per sqft (vinyl $50-100, fiberglass $80-150, concrete $100-200).
  4. Read surface area and total cost.
  5. Add 30-50% for decking, equipment, landscaping.

The formula

surfaceArea = length * width totalCost = surfaceArea * costPerSqFt

Surface area is length times width. Multiply by your price per square foot for the build cost.

Worked example

Say you're planning a 30 by 15 ft fiberglass pool at $100 a square foot. That's 450 sq ft of surface, so a $45,000 build before decking and equipment.

Pool cost by type (total build)

TypeTotal buildLifespan
Vinyl liner$35k – $65k15 – 25 yrs
Fiberglass$40k – $85k25 – 30 yrs
Concrete / gunite$50k – $150k25 – 50+ yrs

Tips & gotchas

  • Vinyl liner pools are cheapest at $35,000 to $65,000.
  • Fiberglass runs $40,000 to $85,000 and installs fast.
  • Concrete or gunite is $50,000 to $150,000 and the most customizable.
  • Add 30 to 50% for decking, equipment, and landscaping.
  • Permits run $300 to $1,500 depending on the jurisdiction.

Frequently asked questions

How much does a pool cost?

Vinyl $35k to $65k, fiberglass $40k to $85k, concrete $50k to $150k.

What's the cheapest pool to build?

Vinyl liner pools, with the lowest material cost.

What lasts longest?

Concrete pools at 25 to 50-plus years, then fiberglass at 25 to 30, vinyl at 15 to 25.

Above-ground vs in-ground?

Above-ground is $1,500 to $15,000, much cheaper but less durable.

How long does it take to build a pool?

Fiberglass 2 to 4 weeks, vinyl 4 to 8, concrete 8 to 12.

Related calculators

Estimates only — see our full disclaimer.